Safety Barriers – Snelling Engineering
Hand Sketches
Drawings
Chip Hood and Main Hood – Snelling Engineering
Completed product based on drawings
Stakka Different Position – Phillbourne
Grain Transfer System
First project of my life at my very first job – From scratch to installation – Worked with my Company director, Laurie Phillips by converting his ideas into a proper CAD model and then producing shop floor drawings of each part using Pro E Software. Hand out to workshop people and make amendments on the go as needed. It was great to see the project coming to life after 2 months of detailing. With a line, seeing drawings come to reality is the biggest satisfaction I get as a draftsperson.
FabTec ASF, Broken Hill
Task: to convert imperial dxf to metric dxf.
Towers Engineering, Dubbo
Task: Convert sketch into full 3D CAD drawing set.






